Plaster Quantity Calculator India

Estimate cement and sand for wall plaster — room dimensions or net area, single or two-coat (12 mm + 6 mm), IS 1542 mix practice.

Educational BOQ only. Excludes waterproofing, putty, and paint litres. Two-coat uses independent ratios per coat.

How to use this calculator

  1. Mode A: direct net area, or Mode B: room L×W×H.
  2. Single or two-coat; thickness presets 6–20 mm.
  3. Door/window deductions and optional ceiling.
  4. Calculate bags, sand, per-m² reference.

After plaster, estimate paint with the paint & tile estimator.

Free Tool Quantity Surveying

Plaster Quantity Calculator

Cement bags & sand for internal/external plaster · IS 1542:1992 · fdm = 1.33

Coat system
Wastage

Coat — thickness & mix ratio

Thickness (mm)
Mix ratio (cement:sand)

Enter the net plaster area after deducting openings. For room-based calculation with deductions, use Mode B.

Net surface area to be plastered, after deducting doors and windows.

Frequently asked questions

Standard plaster thickness — internal vs external?

Internal walls: typically 12 mm at 1:6 for residential. External walls: 15–20 mm at 1:3 or 1:4 for weather resistance. IS 1542:1992 (paraphrased) describes a two-coat system: 12–15 mm base + 6 mm finish = 18–20 mm total. CPWD analysis of rates specifies 15 mm external and 12 mm internal as schedule defaults.

12 mm vs 20 mm — when to use each?

12 mm suits well-laid internal brickwork in protected locations. 20 mm (or 15+6 mm two-coat) is used for external surfaces, rough or irregular masonry, and where improved weather resistance or waterproofing is required. A thicker base coat also compensates for uneven backing without sagging — IS 1542 recommends two coats for total thickness above 20 mm.

Dry factor 1.33 or 1.60 — which is correct?

This calculator uses 1.33 — confirmed in PLASTER_WORK.xlsx and BRICK_WORK.xlsx (Speak Arch sources) and consistent with CPWD analysis of rates. The 1.60 convention (50% voids + 10% unevenness) appears in some QS textbooks and gives ~20% more material. To be conservative with 1.33, add 5–10% wastage (provided as a chip above).

How are doors and windows deducted?

IS 1200:Part 14 (paraphrased): openings below 0.5 m² — no deduction; 0.5–3 m² — deduct one face; above 3 m² — deduct both faces. Standard door ≈ 1.89 m² (2.1×0.9 m); standard window ≈ 1.80 m² (1.5×1.2 m) — both fall in the deduct-one-face range. This calculator deducts user-entered opening areas from one face.

Plaster calculator vs Cement–Sand calculator (Tool 8)?

Tool 8 is a general mortar estimator for any application (bedding, pointing, screeds). This tool is specific to plastering — it adds room-geometry input (2(L+W)×H formula), two-coat system with independent ratios per coat, IS 1542 thickness presets, and per-m² reference. For brick wall BOQ including brick count, use the Brick Quantity Calculator.

Does this include waterproofing, putty, or paint?

No. Cement–sand plaster only. Waterproofing (SBR, crystalline) is applied separately in m². Wall putty (skim coat) is measured separately. For paint litres, use the Speak Arch Paint & Tile Estimator.

How many bags per m² of 12 mm plaster at 1:6?

Per m²: V_wet = 0.012 m³; V_dry = 0.01596 m³; cement = 0.01596/7×1440 = 3.28 kg = 0.066 bags/m². For 100 m²: 6.56 → 7 bags (rounded up). Sand: 13.7 L/m². Always round bags up — partial bags cannot be returned. Use the calculator above for exact values per your area and wastage.

Related calculators

RCC

Concrete Volume

RCC slab, beam, column, footing — M10–M25, dry factor 1.54.

Open calculator →

Masonry

Brick Quantity

Wall brick count, mortar 1:4, cement & sand — IS 1077.

Open calculator →

Rebar

Steel Weight

TMT bar schedule, D²/162, Fe 500/550 display.

Open calculator →

Mortar

Cement–Sand

Mortar by volume or area × bed thickness, 1:3–1:6.

Open calculator →

Budget

Construction cost

₹/sq ft by city band.

Open →

Paint

Paint & tile

Litres and floor coverage.

Open →

FAR

FAR / FSI

Built-up from plot area.

Open →

Hub

All tools

Speak Arch calculator index.

Tools hub →

Guides

Construction guides

RCC, masonry, finishing.

Guides →

Quantity surveying cluster

Explore all tools on the quantity surveying hub.

Methodology · Corrections · Disclaimer

Disclaimer: Educational estimate only. Speak Arch is online-only. contact@speakarch.com

Last updated: 26 May 2026